Alfred Street water main renewal

Share Alfred Street water main renewal on Facebook Share Alfred Street water main renewal on Twitter Share Alfred Street water main renewal on Linkedin Email Alfred Street water main renewal link

Council is replacing the existing water main on Alfred Street between Wellington to Peel streets from November 18, 2024.

The works are being undertaken to replaceaged infrastructure and to ensure the optimal reliability of council’s water network.

The works are being undertaken, Monday to Friday, 6am to 6pm. Some weekend and night work may also be required.

Work is expected to be completed by late January, 2025, weather permitting.

As a result of these works, there will be traffic control in place which includes single-lane traffic. The westbound lane will be closed during working hours for the duration of the project. Please adhere to all signage and instructions.

The centre parking on Alfred Street, between Wellington and Peel streets, will be unavailable for the duration of the work.

There will also be water interruptions associated with these works. However, council will provide surrounding residents with a minimum of 48 hours notice prior to planned interruptions occurring.

WORK MAP

Should you have any questions about these works, please contact Supervisor Construction Carl Teske on 1300 MACKAY (622 529).

Council is replacing the existing water main on Alfred Street between Wellington to Peel streets from November 18, 2024.

The works are being undertaken to replaceaged infrastructure and to ensure the optimal reliability of council’s water network.

The works are being undertaken, Monday to Friday, 6am to 6pm. Some weekend and night work may also be required.

Work is expected to be completed by late January, 2025, weather permitting.

As a result of these works, there will be traffic control in place which includes single-lane traffic. The westbound lane will be closed during working hours for the duration of the project. Please adhere to all signage and instructions.

The centre parking on Alfred Street, between Wellington and Peel streets, will be unavailable for the duration of the work.

There will also be water interruptions associated with these works. However, council will provide surrounding residents with a minimum of 48 hours notice prior to planned interruptions occurring.

WORK MAP

Should you have any questions about these works, please contact Supervisor Construction Carl Teske on 1300 MACKAY (622 529).

Page published: 13 Nov 2024, 10:54 AM